Work is underway on the roof of our client J’Ose Alu in Saint Pierre de La Réunion. The current stage is the installation of the aluminum rails which constitute the load-bearing structures which will accommodate the photovoltaic panels and ensure their perfect stability.
The next step will be the installation of 239 panels allowing the production of 110 MWh of green, local and economical electricity.